• 118 Daddow Road, Kewdale WA 6105
  • +61 8 6186-9516
  • admin@mvlv.com.au

CONTAINERISED CONTROL ROOM FITOUT – 2016

The Scope: Supply and fitout 1x 40ft Shipping Container control room, including painting, air conditioning, insulating panelling and electrical installation.

This container was built to house electrical control panels, UPS units, battery cabinets and communications equipment, but was also designed as a operable control room.

MVLV supplied the container including the insulating panelling and installed the client free issued equipment to the container including installation of frames, fixings and extra supports as necessary to facilitate a complete install.

MVLV were able to produce accurate general arrangement drawings based on the information provided for the equipment supplied to allow for an accurate depiction of the finalised layout of the container, and produced ‘As Built’ drawings on completion of the project.

  • Control room container supply.

  • Insulating panel supply and installation.

  • Lighting, and small power fitout, including DB supply.

  • Free issued control and communication panel installation.

  • Container air-conditioning and fire detection.

Through the dedication of MVLV staff, the project was completed on-time and to the Client’s satisfaction, providing a great result to the end user.

 

PROJECT NUMBER: 0208
LOCATION: Coober Pedy, South Australia
CONTRACT DETAILS: Container Supply & Fitout
DURATION: October 2016 to December 2016